Welcome to Port3101.org : Your BES Connection Mark forums read | View Forum Leaders
Port3101.org : Your BES Connection



Reply
LinkBack Thread Tools Display Modes
KB18672 - How to change the order in which a phone rings using BlackBerry MVS 4.6
 
  #1 (permalink)  
Old 07-30-2009, 02:39 PM
hdawg's Avatar
Proprietor
 
Join Date: Nov 2008
Posts: 2,238
Blog Entries: 147
Default KB18672 - How to change the order in which a phone rings using BlackBerry MVS 4.6

KB18672 - How to change the order in which a phone rings using BlackBerry MVS version 4.6


Environment

  • BlackBerry® Mobile Voice System version 4.6
  • BlackBerry® smartphones



Overview

If the phones that are associated with a user account are configured to ring sequentially, the option exists to change the priority of the ring. If multiple phones have the same priority setting, BlackBerry MVS rings the phones in the order that they appear in the Phones list of the BlackBerry MVS web UI.
  1. Log in to the BlackBerry MVS web UI.
  2. Select a phone number.
  3. In the Priority drop-down list, click a number for the priority of the phone. Note: Number one (1) is the highest priority.
  4. Click Submit.
Note: Repeat steps 4 to 6 for each phone.
__________________
http://blog.port3101.org/hdawg/

The views expressed by me on Port3101 and its affiliated sites are my own and do not necessarily reflect the views of my employer.
Reply With Quote
Sponsored Links
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 08:10 AM.
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.


 

SEO by vBSEO 3.3.2 PL2